UK Facade Specialists

Built
for the
Front
Line.

Curtain wall, rainscreen cladding, windows, and Building Safety Act compliant fire remediation — delivered with precision from initial survey to final sign-off.

18m+
Higher-Risk Building Experience
BSA
2022 Compliant
EWS1
Remediation Ready
CHAS Accredited
Constructionline Gold
CDM 2015 Compliant
Building Safety Act 2022
PAS 9980:2022
£10m Public Liability

What We Do

Complete Facade Solutions

From new-build structural glazing and unitised curtain wall systems to full rainscreen cladding packages and facade fire remediation — we deliver every element of the building envelope under one contractor.

01

Curtain Wall & Structural Glazing

New-build and refurbishment curtain wall packages including structural glazing, unitised CW systems, and stick systems. Full design co-ordination, fabrication interface, and installation across commercial and residential high-rise buildings to CWCT standards.

02

Rainscreen Cladding Systems

Complete rainscreen cladding systems and packages across all major facade types — aluminium composite, terracotta, zinc, fibre cement, and timber. SFS sub-framing, insulation, breather membrane, cavity barriers, and all ancillary works included as a full envelope package.

03

Windows & Glazing

Residential and commercial window replacement, aluminium and timber-aluminium composite systems, fire-rated glazing, and window installation as part of wider facade packages.

04

Facade Fire Remediation

End-to-end fire remediation delivery from intrusive survey and FRAEW opening-up works through to removal, replacement, and EWS1 sign-off. Principal Contractor or subcontract basis.

05

SFS & Substrate Works

Steel frame system design and installation, sheathing boards, cavity barriers, and fire stopping as part of complete external wall build-up packages.

06

Surveys & Inspections

Intrusive and non-intrusive facade surveys, condition reports, FRAEW opening-up works, photographic records, and technical reports to support EWS1 assessment.

Fire Safety Specialism

Building Safety Act Remediation

We operate across the full Building Safety Act compliance landscape — from initial FRAEW surveys through to certificate-ready handover on occupied residential buildings.

  • FRAEW Survey Works
    Intrusive opening-up works to facilitate Fire Risk Appraisal of External Wall construction by a suitably qualified assessor.
  • Cladding Removal & Replacement
    Safe removal of non-compliant cladding systems and replacement with A1/A2-rated alternatives to current fire safety standards.
  • Cavity Barrier Installation
    Retrospective cavity barrier installation at floor and compartment lines, including fire stopping at penetrations and junctions.
  • EWS1-Ready Handover
    Full documentation pack, photographic evidence schedule, and co-ordination with the appointed FRAEW assessor for EWS1 sign-off.
Regulatory Framework
Building Safety Act 2022 PAS 9980:2022 EWS1 BS 8414 BR 135 CDM 2015 Building Regulations Part B FRAEW Fire Safety Act 2021 HSE Gateway Process

We work as Principal Contractor or specialist subcontractor across leaseholder-funded, BSF-funded, and developer-funded remediation schemes. All works are delivered in line with current Building Safety Regulator guidance and the Higher-Risk Buildings framework.

Who We Work With

Our clients include residential building owners, Right to Manage companies, housing associations, local authorities, managing agents, and principal contractors seeking a specialist facade remediation subcontractor.

We understand the pressures leaseholders face and deliver programmes designed around building occupation, minimising disruption and keeping residents informed throughout.

How We Work

Our Delivery Process

A structured, transparent approach from first contact to final sign-off — no surprises, no gaps.

Initial Survey & Scoping

Desk-top review, site visit, and scope of works developed in line with assessor findings or client brief.

Design & Procurement

Specification development, contractor procurement, design co-ordination and value engineering.

Pre-Construction

CPP, RAMS, scaffold design, resident notification, and BSR gateway submissions where required.

Works on Site

Facade installation or remediation delivered by our directly employed teams with full site management.

Handover & Sign-Off

O&M manual, photographic record, defects liability management, and EWS1 co-ordination.

Why Frontline Facades

Specialists, Not Generalists

We exist solely in the facade and fire remediation space. That focus means deeper technical knowledge, faster problem-solving on site, and credibility with assessors, architects, and building owners.

Single-Point Accountability
One contractor, one point of contact, full responsibility for the envelope package from survey to completion.
Fire Safety Expertise
Deep working knowledge of PAS 9980, BSA 2022, and the FRAEW process — we understand what assessors need before they ask.
Leaseholder Aware
We work sensitively in occupied buildings, understanding the anxiety of leaseholders and the reputational pressure on building owners.
Coverage
UK Wide
Operating across England with North West base
Liability Cover
£10m
Public & Employers Liability Insurance
Building Types
Residential · Commercial · Mixed-Use
Including higher-risk buildings (18m+/7+ storeys) under the Building Safety Act, residential towers, commercial office buildings, student accommodation, and mixed-use developments.
Accreditations
CHAS Constructionline SafeContractor SSIP

Our Work

Completed Projects

A selection of facade installation and remediation projects delivered across the UK — curtain wall, rainscreen cladding, structural glazing, and SFS packages.

Manchester Waters residential facade package
Rainscreen Cladding & Curtain Wall
Manchester Waters
Herculaneum Quay high-rise curtain wall
Curtain Wall & Glazing
Herculaneum Quay
Everton Stadium rainscreen cladding
Rainscreen Cladding
Everton Stadium
Structural glazing glass box project
Structural Glazing
Glass Box — Duke Street
Proto beam curtain wall installation
Curtain Wall & Structural Glazing
Proto Beam
SFS substrate works residential building
SFS & Substrate Works
Residential — SFS Package

Get in Touch

Start a Conversation

Whether you have a live remediation project, a new-build facade package, or just want to understand what's involved — we're happy to talk it through.

Phone
07487 598751  |  07940 219995
Email
info@frontlinefacades.co.uk
accounts@frontlinefacades.co.uk
julian@frontlinefacades.co.uk
Base
Merseyside, North West England
Request a Quote

Tell us about your project and we'll come back to you within one working day.

We respond within one working day. Your details are never shared with third parties.

Enquiry Received

Thank you — we'll be in touch within one working day to discuss your project.